processing...

Blog Details

Sinopec Great Wall Energy operates Acetic acid plant at lower rates

Sinopec Great Wall Energy operates Acetic acid plant at lower rates

Jun 15, 2026

Sinopec Great Wall Energy and Chemical is presently running its acetic acid plant at curtailed rates. A source in China informed a team member, “The company is running the plant at around 50% of production capacity since mid-February 2026. The reason behind the production cut could not be ascertained.” Located in Ningdong, Ningxia in China, the plant has a production capacity of 410,000 mt/year.